Taking natural light as the starting point, this project disassembled the top floor, added mezzanines according to the position of the beams, hollowed out the middle floor, and directly penetrated the light source from the top floor to the semi-basement. 

Considering the circulation, the staff circulation is concentrated in the center, with a separate staircase leading to the storage and staff toilets on the ground floor, and the vertical circulation of guests is concentrated on the east side of the space.